A renovation to-do list that survives the project
Renovations fail on communication, not on effort.
The list you write at the start of a renovation is obsolete within a fortnight. Jobs multiply, trades find things, decisions change, and a spreadsheet of room names stops describing the building.
What to record per job
- A photograph of the exact spot — the single most useful item, and the one usually missing
- Which room and where in it
- What is wrong or what you want
- Whether it blocks something else
- Who does it: you, or which trade
- Measurements, if relevant
- Any receipt, quote or spec as a document on the card
Why photographs do heavy lifting here
Three reasons specific to building work.
You cannot describe it accurately. "The crack in the hallway" is four cracks by week three. A photograph identifies which, and how it has changed since you took it.
Other people need to see it. Sending a plumber a picture of the pipe saves a visit. Showing a shop the fitting you need saves the wrong part. This is the single biggest practical saving in a renovation.
Before and after is the record. For disputes, for the landlord, for insurance, and for remembering what was behind the plasterboard. Photograph before anything is covered up — every renovation produces at least one moment of wishing you had.
Organise by room, not by trade
Trade-based lists look logical and fail in use, because you work room by room and because one job usually involves two trades. A list per room, with the trade noted on each card, matches how the work actually happens.
Keep a "blocked" list. The single biggest source of renovation delay is a job waiting on a decision nobody has made — a tile not chosen, a measurement not taken. Those are not tasks for later; they are tasks for today, and they belong in their own visible group.
Sequence that avoids rework
- Structural and anything behind walls
- First-fix electrics and plumbing
- Plastering
- Flooring subfloor
- Painting, first coats
- Second-fix electrics and plumbing
- Flooring finish
- Painting, final coat
- Fittings and furniture
Every renovation that goes out of order repaints something. Photograph each stage before the next covers it.
What to do with the list afterwards
Do not delete it. The photographs of what is behind the walls, the paint codes, the model numbers and the receipts are worth more in three years than they are now. Keep the completed board.
Worth saying plainly: Pinodi is my own app, so take the recommendation with that in mind. The rest of this is useful whatever you track it in.
Pinodi suits this well: a card per job is a photograph of the actual spot, with the measurement as a note and the quote as a PDF inside it. Boards per room, and the board shares as an image — handy for sending a trade the week's jobs in one message. Free up to ten active cards; a full renovation will need Pro.
Frequently asked questions
How do I keep track of a home renovation?
Record each job with a photograph of the exact spot, the room, what is wrong, whether it blocks anything else, who does it and any measurement or quote. Organise by room rather than by trade, because you work room by room and most jobs involve two trades.
Why photograph during a renovation?
Because you cannot describe a crack or a pipe fitting accurately in words, because sending a trade a picture saves a visit and buying the wrong part, and because photographs taken before anything is covered up become the record you will want years later.
Pinodi: photograph it, that is the task
A to-do app where tasks are photos and short text cards. Free up to 10 active cards, no account, no tracking. iPhone and iPad.
Get Pinodi on the App Store →By Lisa Braun — designer & app developer